Uganda Steel Coil Processing Plant
Project case: Uganda Steel Coil Processing Plant:
Detailed introduction
Project Description: 30x 120M
Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc
Time: Oct. 25, 2012
Location: Uganda
Project Introduction
Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client’ s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.