Xinwenhua Center Auditorium
Project Case:Xinwenhua Center Auditorium:
Project Overview:
Fabricate and erect approximately 2500 tonnes of structural steel work. The majority being roof steel work over the auditorium which was supported by four 29m long trusses spanning between the reinforced concrete walls.
The trusses were pre-fabricated in sections and as we were faced with a very tight city centre site it was essential to work very closely with other sub-contractors to plan the on site assembly of the trusses prior to installation.