warehouse construction for Brazil HD logistics Park
Project case: warehouse construction for Brazil HD logistics Park, 2014, 19, 200SQM
Warehouse size is 160m length* 120m width* 15m height. Because the schedule is very tight, the contractor require to be completed within one month. Our company try our best to only use 25 days finish the project. Get government and HD Group highly praise.
Project Introduction
Technical specification:
1) Column spacing: 6 m
2) Steel column: Q345, H500 * 200 * 10 * 12( GB)
3) Steel beam: Q345, H( 300-600) * 200 * 8 * 12( GB)
4) Roof purlin: C160 * 60 * 20 * 2.3( GB)
5) Wall purlin: C160 * 60 * 20 * 2.3( GB)
6) Column bracing: 25 steel round
7) Horizontal bracing: 25 steel round
8) Gutter water system: 3mm steel sheet, 160 PVC downpipe
9) Roof panel( outside): V-760, 0.5mm single board+ 75mm fiberglass+ aluminum foil
10) Wall panel: V-820, 0.5mm single board
11) Components paint: main structure sprayed 3 times, secondary frame for 2 times with iron red acrylic anti-rust paint and a medium gray alkyd primer
The client hired the SGS as the 3rd party QC, all WPS and QAP are adopting the highest international standard. We perfectly finish this project and won the trust of the client. Client told us, this is the real win-win business. Because we help them win the trust and profit from the owner due to our quick delivery with best quality.